Câu hỏi:
22/07/2024 164The latest heritage at risk register revealed that 5,831 listed buildings, monuments, archaeological sites, and landscapes in England are at ________ of being lost.
A. edge
B. risk
C. ease
D. danger
Trả lời:
Kiến thức: Cụm từ
Giải thích:
in danger of = at risk of: có nguy cơ bị làm sao
on the edge of: bên bờ vực (nguy hiểm)
for ease of: để mà dễ
Tạm dịch: Các di sản mới nhất về đăng ký rủi ro cho thấy rằng 5,831 tòa nhà, di tích được liệt kê,
địa điểm khảo cổ và cảnh quan ở Anh có nguy cơ bị mất.
Chọn B
CÂU HỎI HOT CÙNG CHỦ ĐỀ
Câu 1:
Read the following passage and mark the letter A, B, C or D on your answer sheet to indicate the correct word or phrase that best fits each of the numbered blanks
A YEAR WITH OVERSEAS VOLUNTEERS
I was with Overseas Volunteers (OV) for a year after leaving university, and I was sent to an isolated village in Chad, about 500 kilometers from the capital N'Djamena. Coming from a rich country, I got quite a shock, as conditions were much harder than I had expected. But after a few days I got used to (11)_______ there. The people were always very friendly and helpful, and I soon began to appreciate how beautiful the countryside was.
One of my jobs was to supply the village (12)______ water. The well was a long walk away, and the women used to spend a long time every day (13)______ heavy pots backwards and forwards. So I contacted the organization and arranged to have some pipes delivered. (14)______ these pipes were not really perfect, they still made a great difference to the villagers.
All in all, I think my time with OV was a good experience. Although it was not paid, it was well worth doing and I would recommend it to anyone (15)______ was considering working for a charity.
Điền ô số 13
Câu 2:
Read the following passage and mark the letter A, B, C or D on your answer sheet to indicate the correct word or phrase that best fits each of the numbered blanks
A YEAR WITH OVERSEAS VOLUNTEERS
I was with Overseas Volunteers (OV) for a year after leaving university, and I was sent to an isolated village in Chad, about 500 kilometers from the capital N'Djamena. Coming from a rich country, I got quite a shock, as conditions were much harder than I had expected. But after a few days I got used to (11)_______ there. The people were always very friendly and helpful, and I soon began to appreciate how beautiful the countryside was.
One of my jobs was to supply the village (12)______ water. The well was a long walk away, and the women used to spend a long time every day (13)______ heavy pots backwards and forwards. So I contacted the organization and arranged to have some pipes delivered. (14)______ these pipes were not really perfect, they still made a great difference to the villagers.
All in all, I think my time with OV was a good experience. Although it was not paid, it was well worth doing and I would recommend it to anyone (15)______ was considering working for a charity.
Điền ô số 14
Câu 3:
Read the following passage and mark the letter A, B, C or D on your answer sheet to indicate the correct word or phrase that best fits each of the numbered blanks
A YEAR WITH OVERSEAS VOLUNTEERS
I was with Overseas Volunteers (OV) for a year after leaving university, and I was sent to an isolated village in Chad, about 500 kilometers from the capital N'Djamena. Coming from a rich country, I got quite a shock, as conditions were much harder than I had expected. But after a few days I got used to (11)_______ there. The people were always very friendly and helpful, and I soon began to appreciate how beautiful the countryside was.
One of my jobs was to supply the village (12)______ water. The well was a long walk away, and the women used to spend a long time every day (13)______ heavy pots backwards and forwards. So I contacted the organization and arranged to have some pipes delivered. (14)______ these pipes were not really perfect, they still made a great difference to the villagers.
All in all, I think my time with OV was a good experience. Although it was not paid, it was well worth doing and I would recommend it to anyone (15)______ was considering working for a charity.
Điền ô số 11
Câu 4:
Read the following passage and mark the letter A, B, C or D on your answer sheet to indicate the correct word or phrase that best fits each of the numbered blanks
A YEAR WITH OVERSEAS VOLUNTEERS
I was with Overseas Volunteers (OV) for a year after leaving university, and I was sent to an isolated village in Chad, about 500 kilometers from the capital N'Djamena. Coming from a rich country, I got quite a shock, as conditions were much harder than I had expected. But after a few days I got used to (11)_______ there. The people were always very friendly and helpful, and I soon began to appreciate how beautiful the countryside was.
One of my jobs was to supply the village (12)______ water. The well was a long walk away, and the women used to spend a long time every day (13)______ heavy pots backwards and forwards. So I contacted the organization and arranged to have some pipes delivered. (14)______ these pipes were not really perfect, they still made a great difference to the villagers.
All in all, I think my time with OV was a good experience. Although it was not paid, it was well worth doing and I would recommend it to anyone (15)______ was considering working for a charity.
Điền ô số 15
Câu 6:
Read the following passage and mark the letter A, B, C or D on your answer sheet to indicate the correct answer to each of the questions
In the twentieth - century, people depend on unlimited energy to power their everyday lives. A wide range of energy-run devices and modern conveniences are taken for granted, and although it may seem that we will never be in danger of living without those conveniences, the fact is that many supplies of energy are dwindling rapidly. Scientists are constantly searching for new sources of power to keep modern society running. Whether future populations will continue to enjoy the benefits of abundant energy will depend on the success of this search.
Coal, oil, and natural gas supply modern civilization with most of its power. However, not only are supplies of these fuels limited, but they are a major source of pollution. If the energy demands of the future are to be met without seriously harming the environment, existing alternative energy sources must be improved or further explored and developed. These include nuclear, water, solar, wind, and geothermal power, as well as energy from new, nonpolluting types of fuels. Each of these alternatives, however, has advantages and disadvantages.
Nuclear power plants efficiently produce large amounts of electricity without polluting the atmosphere; however, they are costly to build and maintain, and they pose the daunting problem of what to do with nuclear waste. Hydroelectric power is inexpensive and environmentally safe, but impractical for communities located far from moving water. Harnessing energy from tides and waves has similar drawbacks. Solar power holds great promise for the future but methods of collecting and concentrating sunlight are as yet inefficient, as are methods of harnessing wind power.
Every source of energy has its disadvantages. One way to minimize them is to use less energy. Conservation efforts coupled with renewable energy resources, such as a combination of solar, water, wind, and geothermal energy and alternative fuels, such as alcohol and hydrogen, will ensure supplies of clean, affordable energy for humanity's future.
From the passage, it can be inferred that to solve our energy problems ________ .
Câu 7:
Mark the letter A, B, C or D on your answer sheet to indicate the word(s) OPPOSITE in meaning to the underlined word(s) in each of the following questions.
After a long time working incessantly, all my efforts ended in failure.
Câu 8:
Mark the letter A, B, C or D on your answer sheet to indicate the most suitable response complete each of the following exchanges.
Stranger: “Excuse me! Can you show me the way to Main Street, please?”
Man: “___________”
Câu 9:
Read the following passage and mark the letter A, B, C or D on your answer sheet to indicate the correct answer to each of the questions
In the twentieth - century, people depend on unlimited energy to power their everyday lives. A wide range of energy-run devices and modern conveniences are taken for granted, and although it may seem that we will never be in danger of living without those conveniences, the fact is that many supplies of energy are dwindling rapidly. Scientists are constantly searching for new sources of power to keep modern society running. Whether future populations will continue to enjoy the benefits of abundant energy will depend on the success of this search.
Coal, oil, and natural gas supply modern civilization with most of its power. However, not only are supplies of these fuels limited, but they are a major source of pollution. If the energy demands of the future are to be met without seriously harming the environment, existing alternative energy sources must be improved or further explored and developed. These include nuclear, water, solar, wind, and geothermal power, as well as energy from new, nonpolluting types of fuels. Each of these alternatives, however, has advantages and disadvantages.
Nuclear power plants efficiently produce large amounts of electricity without polluting the atmosphere; however, they are costly to build and maintain, and they pose the daunting problem of what to do with nuclear waste. Hydroelectric power is inexpensive and environmentally safe, but impractical for communities located far from moving water. Harnessing energy from tides and waves has similar drawbacks. Solar power holds great promise for the future but methods of collecting and concentrating sunlight are as yet inefficient, as are methods of harnessing wind power.
Every source of energy has its disadvantages. One way to minimize them is to use less energy. Conservation efforts coupled with renewable energy resources, such as a combination of solar, water, wind, and geothermal energy and alternative fuels, such as alcohol and hydrogen, will ensure supplies of clean, affordable energy for humanity's future.
The passage suggests that _______ .
Câu 10:
Mark the letter A, B, C or D on your answer sheet to indicate the sentence that is CLOSEST in meaning to each of the following sentences.
"Stop smoking or you'll be ill," the doctor told me.
Câu 11:
Xoan singing is a vocal art of villages in the ancestral land of Phu Tho. It has been ________ for generations and the oral tradition is still very much alive today.
Câu 12:
Mark the letter A, B, C or D on your answer sheet to indicate the sentence that is CLOSEST in meaning to each of the following sentences.
He survived the operation thanks to the skillful surgeon.
Câu 13:
Mark the letter A, B, C or D on your answer sheet to indicate the word(s) CLOSEST in meaning to the underlined word(s) in each of the following questions.
They have been forced to live in marginal environments, such as deserts and arctic wastelands.
Câu 14:
The Complex of Hue Monuments was the first site in Viet Nam ________ as a World Heritage Site by UNESCO.
Câu 15:
Read the following passage and mark the letter A, B, C or D on your answer sheet to indicate the correct answer to each of the questions
It is estimated that over 99 percent of all species that have existed have become extinct. What causes extinction? When a species is no longer adapted to a changed environment, it may perish. The exact causes of a species' death vary from situation to situation. Rapid ecological change may render an environment hostile to a species. For example, temperatures may change and a species may not be able to adapt. Food resources may be affected by environmental changes, which will then cause problems for a species requiring these resources. Other species may become better adapted to an environment, resulting in competition and, ultimately, in the death of a species.
The fossil record reveals that extinction has occurred throughout the history of Earth. Recent analyses have also revealed that on some occasions, many species became extinct at the same time- a mass extinction. One of the best-known examples of mass extinction occurred 65 mmion years ago with the demise of dinosaurs and many other forms of life. Perhaps the largest mass extinction was the one that occurred 225 million years ago, when approximately 95 percent of all species died. Mass extinction can be caused by a relatively rapid change in the environment and can be worsened by the close interrelationship of many species. If, for example, something were to happen to destroy much of the plankton in the oceans, then the oxygen content of Earth would drop, affecting even organisms not living in the oceans. Such a change would probably lead to a mass extinction.
One interesting, and controversial, finding is that extinctions during the past 250 million years have tended to be more intensive every 26 million years. This periodic extinction might be due to intersection of the Earth's orbit with a cloud of comets, but this theory is purely speculative. Some researchers have also speculated that extinction may often be random. That is, certain species may be eliminated and others may survive for no particular reason. A species' survival may have nothing to do with its ability or inability to adapt. If so, some of evolutionary history may reflect a sequence of essentially random events.
Which of the following is NOT mentioned in paragraph 1 as resulting from rapid ecological change?